Oil
Gas
Condensate
Chemicals
LNG
Onshore
Offshore
During
Contract
Peak
Time
Expat
1
Professional Services of Base Business,
Integrity and Operation Engineering
Provide and perform Engineering Design, Studies,
and another related services to execute and support
various project development and modification of
Facilities
V V V
Chevron Indonesia
Company
Chevron Makassar Ltd.
Sentral Senayan 1, Jl. Asia Afrika
No. 8, Jakarta 10270
Kompleks Pasir Ridge, Balikpapan
Endang Suhadi Jakarta - Balikpapan USD 861,188 36 months 21 21 0 V V
2
Penyediaan Jasa Tenaga Ahli Dan Sub
Professional/Pendukung Pakugajah
Development Project
Manpower Supply V V PT. Pertamina EP
Gd. Standard Chartered Lt. 32, Jl.
Prof. Dr. Satrio No. 164, Jakarta
Selatan 12950
Daniel Munthe Palembang IDR 10,099,716,107 12 months 35 35 V
3
Manpower Supply Services for Ketapang
Working Area Development Drilling
Program, Indonesia
Manpower Supply for Drilling V V PC Ketapang II Ltd
Talavera Office Park, Talavera
Suite 3rd - 10th Floor, Jl. Letjen.
TB. Simatupang Kav. 22-26,
Jakarta 12190
A. Zikri Fauzan Surabaya USD 4,308,273,000 10,7 months 12 12 2 V V V
4
Engineering Management Services
Provide and perform Engineering Management
Design, Studies, Drafting, Reproduction, Set-up and
provide expertise of project management engineering,
construction management, integrity engineering &
management another related services to execute and
support various project development and modification
of PHE WMO West Java existing oil and gas related
facilities
V V V V PHE WMO
PHE Tower Lt. 16-20, Jl. TB.
Simatupang Kav. 99, Jakarta
12520
Juanto Sitorus / Rina
Widianawati
Jakarta IDR 24.797.529.000 12 months 18 18 V V V V
5
Pekerjaan Jasa Asistensi Teknis - Eng.
Consultancy Services Pekerjaan
Konstruksi Pipa Distribusi Gas Bumi &
Fasilitas Penunjang SBU 1 - PGN (KSO
Prosys - DWE)
Engineering Support for EPC pipeline and Metering V
PT. PGN (Persero) Tbk
SBU DW I
Gedung Wisma Nusantara Lt. 3, Jl.
MH. Thamrin No. 59, Jakarta Pusat
10350
Suko Hartono
Palembang,
Lampung,
Tangerang, Jakarta
dan bekasi
IDR 21,565,000,000 Aug 2014 - Mar 2016 33 33 V V V
6
Pekerjaan Proyek Pembangungan
Bangunan Sipil & Peralatan Pilot Plant
RE(OH)3 di PT. Timah (Persero) Tbk
(EPCI) Detail engineering, Land preparation, Pilling,
Foundation, Mixer, Crane, Micronizer, MCC, Genset,
Pumps, Tanks, piping system, Electrical System,
Insrument and control system, Drainege system, Main
Process Building, Main Office Building, Guard Post.
V PT TIMAH (Persero) Tbk
Jl. Jendral Sudirman 51,
Pangkalpinang 33121 Bangka -
Indonesia
Sukrisno Bangka Barat IDR 14,850,000,000 May 2014 - May 2015 15 35 V
7
Jasa Engineering Surface Facilities Asset
3 Periode 2014 - 2016 (24 Bulan)
Provide and perform Engineering Management
Design, Studies, Drafting, Reproduction, Set-up and
provide expertise of project management engineering
and cost estimation, construction management,
integrity engineering & management another related
services to execute and support various project
development and modification
Pertamina EP Asset 3
Jl. Patra Raya Klayan No. 1,
Cirebon
Benny Klayan IDR 12.195.706.000
15 Sep 2014 - 13
Sep 2016
15 15 V V V V V
8
Wellhead Platform (WHP) Front End
Engineering Design (FEED)
FEED package for ande-ande Lumut Field
Development project. The scope of services is to
provide FEED for Wellhead Platform
V V V V
Santos Northwest natuna
B.V.
Ratu Plaza office tower, Lt 4 Jl.
Jend Sudirman Kav.9 Jakarta
Marjolijn Wayong Nortwest natuna US$. 3,345,484 July 2013-july 2014 30 40 5 V V V
8
Conceptual Engineering for Development
Project STC-0812
Provide and perform Engineering Conceptual Design,
Studies, and another related services to execute and
support various project development and modification
of PHE (Pertamina Hulu Energy) West Java existing
oil and gas related facilities
V V V V
PHE ONWJ Ltd. Perkantoran Hijau Arkadia Tower
D, 10th Floor, Jl TB Simatupang
Kav 85, Jakarta Telp. 021-
78549022 Fax 021-78549061
Yuyung girindra
Offshore North West
Java Sea Block,
Jakarta
US$. 4,666,110.00 Feb 2013-Feb 2015
40 60 0 V V V
Produce Water Treatment improvement Pre - FEED engineering for produced water handling
plan to handle future production plan
V V V V
Harris Grenaldi
Panai
US$. 106,212.00 mar-jul 2013 V V
ONWJ Terminal System Development
Phase - 1
New Terminal Development study (Process Design
basis, simulation, PFD, P&ID, Mechanical, Piping,
Pipeline, Instrument, Safety, Electrical, and stuctural
studies)
V V V V V Hanto Yananto
US$. 166,050.00 mar-jun 2013 V V
ONWJ SP-1 Field Development Study New Field Development study (Process Design basis,
simulation, PFD, P&ID, Mechanical, Piping, Pipeline,
Instrument, Safety, Electrical, and stuctural studies)
V V V V Setiyadi
US$. 212,621.50 mar-sept 2013 V V
Construction
Installation
Quantity Personnel
Supplied
Appraisal
Concept Select.
Detail Eng.
Execution
EPC Management
Client Address & Phone
Contact
Person
Work Location Contract Value
Period & Progress
Status
Nature of Project
Faciliti
es
Client Information Contract Information
Engineering
Phase
Project
Management
Services
ATTACHMENT
PT. DEPRIWANGGA ENGINEERING PROJECT HISTORY (1998-Present)
No Project Name Scope of Work
Comm. & Start-Up
Planning
Oil
Gas
Condensate
Chemicals
LNG
Onshore
Offshore
Construction
Installation
Quantity Personnel
Supplied
Appraisal
Concept Select.
Detail Eng.
Execution
EPC Management
Client Address & Phone
Contact
Person
Work Location Contract Value
Period & Progress
Status
Nature of Project
Faciliti
es
Client Information Contract Information
Engineering
Phase
Project
Management
Services
PT. DEPRIWANGGA ENGINEERING PROJECT HISTORY (1998-Present)
No Project Name Scope of Work
. & Start-Up
ing
ONWJ KLU Field Development Study New Field Development study (Process Design basis,
simulation, PFD, P&ID, Mechanical, Piping, Pipeline,
Instrument, Safety, Electrical, and stuctural studies)
V V V V Setiyadi
US$. 212,743.00 mar-sept 2013 V V
ONWJ OO Field Development Study New Field Development study (Process Design basis,
simulation, PFD, P&ID, Mechanical, Piping, Pipeline,
Instrument, Safety, Electrical, and stuctural studies)
V V V V Roy Bermana
US$. 176,978.50 mar-sept 2013 V V
ONWJ OC Field Development Study New Field Development study (Process Design basis,
simulation, PFD, P&ID, Mechanical, Piping, Pipeline,
Instrument, Safety, Electrical, and stuctural studies)
V V V V Roy Bermana
US$. 138,119.50 mar-sept 2013 V V
Foxtrot Fire & Gas Upgrade Pre-FEED
V V V V Yul Hezrin
US$. 90,635.00 Apr-aug 2013 V V
9
Technical Services Contract for
Engineering Services STC#0759
Provide and perform Engineering Management
Design, Studies, Drafting, Reproduction, Set-up and
provide expertise of project management engineering
and cost estimation, construction management,
integrity engineering & management another related
services to execute and support various project
development and modification of PHE (Pertamina
Hulu Energy) West Java existing oil and gas related
facilities
V V V V
PHE ONWJ Ltd. Perkantoran Hijau Arkadia Tower
D, 10th Floor, Jl TB Simatupang
Kav 85, Jakarta Telp. 021-
78549022 Fax 021-78549061
I Made/Restu Offshore North West
Java Sea Block,
Jakarta
US$. 9,991,009.00 Maret 2012 - Maret
2015 25%
35 65 0 V V V V V V V V
Pipeline Replacement Project 2014-2015
(appraise & Select)
Conceptual study for new pipeline KKNA-KLB, MRA-
MMF, Fpro-FB, FSA-FFB, FSWA-FSA, etc
V V V
Setiyadi Foxtrot Area ONWJ US$. 77,000.00 Aug 2012-Oct 2012 5 10 V V
Kilo Reactivation Phase II - Appraise &
Select #DWE-009
Conceptual study for KILO Reactivation project
V V V
Heru Suryo KILO Area ONWJ US$. 172,283.00 Jun 2012-Oct 2012 V V
Kilo Reactivation Phase II - FEED #DWE-
057
FEED package for KILO reactivation. V V V V
Hartono Offshore North West
Java Sea Block,
Jakarta
US$. 740,712.00
4%
30 40 0 V V
ECHO & LIMA Fire & Gas Upgrading
Project
Detail Engineering for replacement and upgrading of
existing fire & gas system
V V V V
Pudji R Offshore North West
Java Sea Block,
Jakarta
US$. 118,110.00 May 2012- Dec 2012 V V V
Integrity assestment for NUI provide as built drawing for NUI platform
V V V V
tri agusman Offshore North West
Java Sea Block,
Jakarta
US$. 208,656.00 jun 2012-may 2013 V
QRA Study for Hydraulic Jacking Method Safety study for Hydraulic jacking method
V V V V
Ahmad tutus Offshore North West
Java Sea Block,
Jakarta
US$. 72,000.00 jul-dec 2012 V
Engineering Services for FSO AA Dry
Dock 2014
Engineering package for fire water sprinkler system,
reinforced hull and other modification on FSO AA
V V V V
Bhimasakti Herrinta AA Area ONWJ US$. 214,200.00 Mar-jul 2013
Riser PHA Revalidation MM & CLMY
Preparation
safety study for MM and Cilamaya
V V V V
Margaretha T
MM & Cilamaya area
ONWJ
US$. 21,200.00 may-aug 2013
10
Detail Engineering For Pipeline
Replacement Project
Provide Detail Engineering for Pipeline Replacement
Project in PHE ONWJ
V V V V
JO Trimulya Gemilang &
Sigurros sdn. Bhd.
Wisma Bidakara 2 Lt.16 Jl jend
Gatot subroto Kav 72, Jakarta
Pusat telp 021-8292784
Sulaiman Sabur Offshore North West
Java Sea Block,
Jakarta
USD 179,000.000 Apr 2012-Sept 2012
11
Blanket Engineering for Surface facilities
Region Jawa
Provide Engineering Studies, FEED for Pipeline and
Receiving facility and Cost estimate
V V V V V
Pertamina EP Region
Jawa
Cirebon Benny Balongan IDR 2, 365 billion V V V
12
Electrical & Instrumentation assistance Provide Engineer and designer assistance
V V V V
PT Meindo Elang Indah Jl. Panjang no.5 kebon Jeruk
jakarta Barat
Bintoro Setiabekti jakarta Sept 2012-Aug 2013 3 5 0 V V
13
Pipeline Installation Analysis Provide Engineering Assestment for pipeline material
V V V V
KPM Oil & Gas Jl. Sungai Sambas II No 17
Kebayoran Baru, Jakarta Selatan
12130 Indonesia
Nurman H
Block Naga Pelikan -
Premiere Oil Natuna
US$. 20,000.000 June-Aug 2012 2 3 V V
14
TP Onshore Receiving Facility Study Front End Engineering study to increase capacity of
ORF tanjung Priok From 120 MMSCFD to 300
MMSCFD
V V V V
Nusantara Regas Wisma Nusantara- lt. 19
Jl. M.H. Thamrin No.59
Jakarta 10350-Indonesia
Tanjung Priok <
Jakarta
US$. 26,343.000 June-Dec 2012 8 15 0 V V
Oil
Gas
Condensate
Chemicals
LNG
Onshore
Offshore
Construction
Installation
Quantity Personnel
Supplied
Appraisal
Concept Select.
Detail Eng.
Execution
EPC Management
Client Address & Phone
Contact
Person
Work Location Contract Value
Period & Progress
Status
Nature of Project
Faciliti
es
Client Information Contract Information
Engineering
Phase
Project
Management
Services
PT. DEPRIWANGGA ENGINEERING PROJECT HISTORY (1998-Present)
No Project Name Scope of Work
. & Start-Up
ing
15
HAZOP Workshop for EPCI Dehydration
Plant Cilamaya
Provide Hazop Facilitator and scribe assistance
V V V v
PT Surya Cipta Teknik -
Pertamina Gas
Jl. Bentaran No.1 Cirebon Irwan N Puncak, Jawa Barat IDR 45 million Apr-12 2 2 V
16
HAZOP & HAZID Workshop for EPCI KE-
39, KE-54, KE-38 offshore platform
Provide Hazop Facilitator and scribe assistance
V V V V
Bakrie Construction - PHE
West Madura Offshore
PHE Tower Lt.20 Jl Letjen TB
Simatupang Kav.99 Jakarta 12520
Sarwono Simon Jakarta IDR 40 million 2 2 0
17
HAZOP Pipeline BBRI-PKT Provide Hazop Facilitator and scribe assistance
V V V v
Pupuk Kalimantan Timur Jl Kb Sirih Raya 6 A Gambir
Gambir Jakarta Pusat DKI Jakarta
Jakarta IDR 40 million 2 2 0
18
Technical Services Contract for
Engineering Services
Engineering, design and drafting services to support
modification of Tangguh and offshore facilities shall
include multi disciplines Engineering
V V V V V
BP. Berau Ltd.
Perkantoran Hijau Arkadia Tower D-
E, Jl. TB Simatupang Kav. 88,
Jakarta
Dodi Widiantoro/
Wisnu Mustafa
Jakarta $ 803,736
feb 2012 - Feb 2013
20 20
V V
19
FEED For UL Development by PT.
DEPRIWANGGA
FEED package for UL Development Engineering
Services. The work includes a multidiscipline effort,
generating all engineering deliverables to ensure the
greenfield platform (UL), new 12 " pipeline and
brownfiled at UWA & UXA
V V V PHE ONWJ Ltd.
Perkantoran Hijau Arkadia Tower
D, 10th Floor, Jl. TB Simatupang
Kav. 88, Jakarta Tlp. 021
78549022, Fax. 021 78549061
Yuyung S. Girindra /
Andreass Deny
Jakarta $ 674,000
Nov 11 - Apr 12
32 40
V V V
20
Technical Services Contract for
Engineering Services STC#0436
Provide and perform Engineering Management
Design, Studies, Drafting, Reproduction, Set-up and
provide expertise of project management engineering
and cost estimation, construction management,
integrity engineering & management another related
services to execute and support various project
development and modification of PHE (Pertamina
Hulu Energy) West Java existing oil and gas related
facilities
V V V V
Pertamina Hulu Energy Perkantoran Hijau Arkadia Tower
D, 10th Floor, Jl TB Simatupang
Kav 85, Jakarta Telp. 021-
78549022 Fax 021-78549061
I Made/Restu Offshore North West
Java Sea Block,
Jakarta
US$. 9,045,000.000
June 09-February 11
Estimate Manhour
200.000
35 65 0 V V V V V V V V
-
HAZID/HAZOP Assistance The Scope of engineering services to perform the
Work Order #156 is providing engineering man power
to participate HAZOP/HAZID
V V V V
Margareta Jakarta US$ 3,200 Sep 09 - Sep 09 1 2 0 V
-
HAZID/HAZOP Assistance The Scope of engineering services to perform the
Work Order #165/166/167/168 is providing
engineering man power to participate HAZOP/HAZID
V V V V
Margareta Jakarta US$ 31,900 Sep 09 - Sep 09 2 2 0 V
-
HAZID/HAZOP Assistance The Scope of engineering services to perform the
Work Order #195 is providing engineering man power
to participate HAZOP/HAZID
V V V V
Margareta Jakarta US$ 4,600 Sep 09 - Sep 09 0 2 0 V
-
Halon Phase out The Scope of engineering services to perform the
Work Order #126 is providing engineering man power
to participate Halon removal study, construction
supervision & OM preparation
V V V V
Warno A Jakarta US$ 103,000 Sep 09 - March 10 2 3 2 V V V V V
-
HSSD Installation The Scope of engineering services to perform the
Work Order #124 is providing engineering man power
to participate HSSD installation, construction
supervision & OM preparation
V V V V
Warno A Jakarta US$ 33,000 Sep 09 - March 10 2 2 2 V V V V V
-
MB2 Onshore Fire water detail
engineering
The Scope of engineering services to perform the
Work Order #128 is providing engineering man power
to participate detail engineering of fire water system,
construction supervision & OM preparation
V V V
Warno A Jakarta US$ 93,000 Sep 09 - April 10 2 2 2 V V V V V
-
PHE general specification update The Scope of engineering services to perform the
Work Order #130 is providing support service for
existing specification update
V V V V V
Soeryono Jakarta US$ 38,700 Sep 09 - April 10 2 4 2 V V
-
PHE general New specification The Scope of engineering services to perform the
Work Order #155 is providing support service for
preparation of New PHE specification
V V V V V
Soeryono Jakarta US$ 37,500 Sep 09 - June10 2 4 2 V V
-
Stress analysys for MK TP ORF facilities The Scope of engineering services to perform the
Work Order #158 is providing support service for
stress analysys on the existing piping system inside
MK TP ORF
V V V V
Arliansyah Jakarta US$ 19,400 Dec 09 - Jan10 1 2 1 V V V
-
HVAC review for existing FOXTROT The Scope of engineering services to perform the
Work Order #135 is providing support service for
Reviewing the existing HVAC of FPRO & FSER of
FOXTROT FS
V V V V
Yupito Jakarta US$ 28,000 Dec 09 - March 10 1 2 1 V V V
Oil
Gas
Condensate
Chemicals
LNG
Onshore
Offshore
Construction
Installation
Quantity Personnel
Supplied
Appraisal
Concept Select.
Detail Eng.
Execution
EPC Management
Client Address & Phone
Contact
Person
Work Location Contract Value
Period & Progress
Status
Nature of Project
Faciliti
es
Client Information Contract Information
Engineering
Phase
Project
Management
Services
PT. DEPRIWANGGA ENGINEERING PROJECT HISTORY (1998-Present)
No Project Name Scope of Work
. & Start-Up
ing
-
Flow assurance study by OLGA The Scope of engineering services to perform the
Work Order #112 is providing support service for
Reviewing the existing 3 phase line from JJA to
KCOM by OLGA
V V V V
Setyadi Jakarta US$ 46,000 Dec 09 - March 10 1 2 1 V V V V
-
SLE Esta Cluster PF structure analysys The Scope of engineering services to perform the
Work Order #112 is providing support service for
Reviewing the existing platform in term of seismic
analysys, In place analysys, Fatique analysys & push
over analysys
V V V V
M Amir/Sophia
Kangan
Jakarta US$ 23,000 Dec 09 - March 10 1 2 1 V V V V
-
Fire & Gas detection upgrading for PAPA
PF
The Scope of engineering services to perform the
Work Order #150 is providing support service for
Detail engineering of OPGD, IR fire & gas detector for
PAPA platform
V V V V
Yupito Jakarta US$ 43,000 Dec 09 - March 10 1 2 1 V V V V
-
KLS detail engineering for Fire water
study
The Scope of engineering services to perform the
Work Order #151 is providing support service for
Detail engineering of fire water system especially on
the addition of corrotion inhibitor line ti fire water main
ring
V V V V
Afrizal Jakarta US$ 23,000 Jan 10 - June10 1 1 1 V V V V
-
Project Schedulling & Cost control
Assistance
The Scope of engineering services to perform the
Work Order #110 is to provide project control & cost
control assistance
V V V V
Restu Purboseso Jakarta US$ 26,000 sept 09 - Aug 10 1 0 0 V
-
Infill Well Detail Engineering for KKA-4 Line sizing, PSV Checking, Separator sizing, mark up
drawing
V V V
setiyadi Jakarta US$ 17,500 Aug 09 - Oct 09 2 2 1 V V V
-
Office Managements Services (Talavera
Office Building)
The Scope of engineering services to perform the
Work Order #113 is to provide Office space for PHE
Project Team
V V V
Yuyung S. Girindra Jakarta US$ 117,500 Aug 09 - Mar 10
-
Office Managements Services (Talavera
Office Building)
The Scope of engineering services to perform the
Work Order #113A is to provide Office space for PHE
Project Team
V V V
Yuyung S. Girindra Jakarta US$ 31,300 April 10 - May 10
-
Additional Manhour for FFB Platform
Modification due to infill well FFB-10
The Scope of engineering services to perform the
Work Order #114 is to provide Engineering Assistance
for FFB infill well Project
V V V
setiyadi Jakarta US$ 7,500 Aug 09 - Dec 09 2 2 1 V V V
-
Engineering Assisstance (Field Engineer)
for NGL & Cilamaya Area
The Scope of engineering services to perform the
Work Order #115 is to provide Field engineer
assistance
V V V
Hermanto S Jakarta US$ 86,000 Sept 09 - Aug 10 1 0 0 V
-
Update of Standart Operating Procedures
(SOP) for PHE ONWJ LTD.
Update Standart Operating Procedures
V V V
Soeryono Jakarta US$ 115,500 Sept 09 - Sept 09 4 2 0 V
-
West Java Pipeline Network Review review Pipeline network Data, summary, datasheet,
calculation, drawing
V V V
setiyadi Jakarta US$ 18,500 Oct 09 - Nov 09 5 3 2 V V V V V
-
Deluge System Reactivation for LIMA,
FOXTROT, ECHO, UNIFORM
Review Fire water system, MTO, RFQ, Specification,
datasheet
V V V
Hanto Yananto Jakarta US$ 55,000 Oct 09 - Dec 09 1 0 0 V V
-
Site Suvey to KLB Platform Site survey, reports, verification
V V V
Sophia K Jakarta US$ 2,800 Oct 09 - Dec 09 2 0 0 V
-
Piping Replacement 2010 - Preliminary
Engineering
Cost analysis, material survey, review design basis,
specification, datasheet, drawing,
V V V
Yuyung S. Girindra Jakarta US$ 195,000 Oct 09 - May 10 5 6 2 V V V
-
Site Survey and Assessment for Halon
Replacement with CO2 system - AA,
Bravo, Echo & Foxtrot
Site survey, reports, verification, material quantity
V V V
Warno A Jakarta US$ 54,500 Oct 09 - Nov 09 3 3 1 V V V
-
Engineering Clarification for Power Cable
Replacement at LIMA and MM
Site survey, report, mark-up drawing
V V V
Bambang P Jakarta US$ 9,000 Oct 09 - Dec 09 1 1 0 V V V
-
Instument Eng Ass for PMT The Scope of engineering services to perform the
Work Order #174 is to provide Instrument Engineer
assistance
V V V
Bambang S Jakarta US$ 5,000 Oct 09 - Dec 09 0 1 0 V
-
HALON PHASE OUT SITE SURVEY FOR
NGL & UNIFORM
Site Visit, equipment verification, Site visit report
V V V
Warno A Jakarta US$ 17,750 Nov 09 - Jan 10 1 2 0 V V
Oil
Gas
Condensate
Chemicals
LNG
Onshore
Offshore
Construction
Installation
Quantity Personnel
Supplied
Appraisal
Concept Select.
Detail Eng.
Execution
EPC Management
Client Address & Phone
Contact
Person
Work Location Contract Value
Period & Progress
Status
Nature of Project
Faciliti
es
Client Information Contract Information
Engineering
Phase
Project
Management
Services
PT. DEPRIWANGGA ENGINEERING PROJECT HISTORY (1998-Present)
No Project Name Scope of Work
. & Start-Up
ing
-
Mechanical Engineering Assistance The Scope of engineering services to perform the
Work Order #120 is to provide Mechanical Engineer
assistance
V V V
Tri agusman Jakarta US$ 59,000 Sep 09 - Dec 11 0 2 0 V
-
Project Planning Assistance The Scope of engineering services to perform the
Work Order #122 is to provide Project Planning
Engineer assistance
V V V V
Margareta Jakarta US$ 40,000 Sep 09 - Aug 10 1 0 0 V
-
Engineering Assistance for HAZOP Follow
up and PSWR
The Scope of engineering services to perform the
Work Order #123 is providing engineering man power
to participate HAZOP/HAZID
V V V
Margareta Jakarta US$ 102,000 Sep 09 - Aug 10 0 2 0 V
-
Engineering Assistance for Hallon
Removal and Replacement to AF11E
(East Area) & HSSD/CO2 (West Area)
Prepare Design Basis, Review Datasheets,
procedures. Prepare operating manual, supervision
V V V
Hendrata Jakarta US$ 103,000 Oct 09 - Jan 10 3 3 1 V
-
MB2 Onshore Fire water system design prepare datasheet, cause & effect chart, FAT,
operating manual, including mechanical, piping,
electrical and instrument workpack.
V V V
Hendrata Jakarta US$ 93,000 Oct 09 - Feb 10 3 6 2 V V V
-
Field Engineering Assistance for West
Office, Lima & Papa
The Scope of engineering services to perform the
Work Order #129 is to provide Field Engineer
assistance
V V V
Hermanto S Jakarta US$ 207,000 Sep 09 - Sep 10 0 1 0 V
-
PHE General Specification Updating Update company specification (mechanical, piping,
structure, general, etc)
V V V V
Anggoro Hengki Jakarta US$ 39,000 Oct 09 - Nov 09 5 2 0 V V V
-
KLB INFILL WELL STRUCTURAL
ANALYSIS
Prepare structural analysis (in-place, seismic,fatique,
vortex and wave slam, deck lifting & design report)
V V V
Sophia K Jakarta US$ 21,000 Oct 09 - Dec 09 2 3 2 V V V V
-
Project Scheduling & Control Assistance The Scope of engineering services to perform the
Work Order #133 is to provide Project Scheduler &
Control Engineer assistance
V V V V
Hartono Jakarta US$ 25,500 Oct 09 - Mar 10 1 0 0 V
-
FIELD ENGINEERING ASSISTANCE FOR
ZULU & AVSA AREA
The Scope of engineering services to perform the
Work Order #137 is to provide Mechanical Engineer
assistance
V V V
Hermanto S Jakarta US$ 59,500 Oct 09 - Oct 09 1 0 0 V
-
Piping Engineering Assistance for PMT The Scope of engineering services to perform the
Work Order #140 is to provide Mechanical Engineer
assistance
V V V
Hartono Jakarta US$ 22,000 Sep 09 - Sep 10 1 0 0 V
-
Process Safety Engineering Assisstant for
Routine Engineering Program
The Scope of engineering services to perform the
Work Order #141 is to provide Process Engineer
assistance
V V V
Margareta T Jakarta US$ 52,000 Sep 09 - Sep 10 1 0 0 V
-
ZULU Fire Water Study Prepare process calculation (fire water demand, &
hydraulic), process study, P&ID
V V V
Margareta T Jakarta US$ 12,000 Oct 09 - Dec 09 2 2 2 V V V
-
PHE ONWJ Continuous Risk Reduction
Safety Support
generate general safety support (risk acceptance
criteria, CRR methodology review, review risk
assesment & reduction, risk profiling)
V V V
Margareta T Jakarta US$ 30,000 Oct 09 - Mar 10 7 3 0 V V V
-
Lima Subsidence Feasibility Study review subsurface document, preeliminary desktop
study, feasibilty study report, presentation
V V V
Sophia K Jakarta US$ 48,000 Oct 09 - Dec 09 7 3 0 V V V
-
ALARM SIMPLIFICATION generate alarm philosophy, list verivication, sirine &
alarm warning
V V V
Margareta T Jakarta US$ 17,000 Oct 09 - Dec 09 2 2 0 V V V
-
Document Control Assistance (for CRR,
FCP and Specification)
The Scope of engineering services to perform the
Work Order #153/153A is to provide Mechanical
Engineer assistance
V V V
Restu Purboseso Jakarta US$ 16,500 100% 0 0 1 V
-
Engineering Assisstance for Support
LCOM V-30 Reactivation
The Scope of engineering services to perform the
Work Order #154/154A is to provide process Engineer
assistance
V V V
Arliansyah Jakarta US$ 62,000 100% 0 1 0 V
-
ADDITIONAL NEW SPECIFICATION
DEVELOPMENT FOR PHE
generate company specification (mechanical, piping,
structure, general)
V V V
Soeryono Jakarta US$ 96,000 100% 4 2 V V V
Oil
Gas
Condensate
Chemicals
LNG
Onshore
Offshore
Construction
Installation
Quantity Personnel
Supplied
Appraisal
Concept Select.
Detail Eng.
Execution
EPC Management
Client Address & Phone
Contact
Person
Work Location Contract Value
Period & Progress
Status
Nature of Project
Faciliti
es
Client Information Contract Information
Engineering
Phase
Project
Management
Services
PT. DEPRIWANGGA ENGINEERING PROJECT HISTORY (1998-Present)
No Project Name Scope of Work
. & Start-Up
ing
-
Engineering Assistance for Piping and
Mechanical Construction Supervisor
The Scope of engineering services to perform the
Work Order #154/154A is to provide mechanical &
piping Engineer assistance
V V V
Anggit santia Jakarta US$ 45,000 100% 2 0 0 V
-
Field Engineering Assisstance for KLA The Scope of engineering services to perform the
Work Order #159 is to provide Mechanical Engineer
assistance
V V V
Hermanto S Jakarta US$ 86,000 100% 0 1 0 V
-
Project Engineer for ECOM Retrofit
Project
The Scope of engineering services to perform the
Work Order #164 is to provide Mechanical Engineer
assistance
V V V
Taufiq
Adityawarman
Jakarta US$ 32,000 100% 1 0 0 V
-
APN FEED Review Review feed documents (datasheet, MTO, drawing,
P&ID, including process, mechanical, piping,
structure, instrument, electrical documents)
V V V
Arliansyah Jakarta US$ 120,000 Dec 09 - feb 10 1 3 2 V
-
TAR 2010 Scope Breakdown - ECHO prepare engineering execution for control valve, flare
tip, instrumentation, online monitor, PFD)
V V V
Drajat agus widodo Jakarta US$ 15,000 Jan 10-Jul 10 7 0 3 V V V V
-
Kilo Reactivation Study Prepare conceptual study, process modelling,cost
estimation, equipment sizing, calculation, instrument
list, piping list, project schedule, IDC meeting
V V V
setiyadi Jakarta US$ 64,000 Dec 09 - jul 10 2 2 2 V V V V
-
Service Life Extension for LB Platform Prepare structural analysis (in-place, seismic,fatique,
vortex and wave slam, deck lifting & design report)
V V V
amiruddin Jakarta US$ 18,000 Mar 10 - Dec 10 2 2 1 V
-
Engineering Assistance and Supervision
for Pipeline Replacement Project 2010
The Scope of engineering services to perform the
Work Order #175 is to provide Mechanical Engineer
assistance
V V V
Yuyung S. Girindra Jakarta US$ 36,500 Feb 10 - Apr 10 2 0 0 V
-
Senior Electrical Engineer The Scope of engineering services to perform the
Work Order #176 is to provide Mechanical Engineer
assistance
V V V
Bambang S Jakarta US$ 18,000 Feb 10 - Apr 10 1 0 0 V
-
JFO-01 NUI Improvement Project 2010 -
UA, EC & ETA
Prepare drawing, MTO, RFQ, site surfey, datasheet,
construction supervision
V V V
Anggoro Hengki Jakarta US$ 53,500 Jan 10 - Jul 10 4 4 2 V V V
-
Engineering Assistance for Project
Modification Team
The Scope of engineering services to perform the
Work Order #178 is to provide Mechanical Engineer
assistance
V V V
Yuyung S. Girindra Jakarta US$ 29,000 Jan 10 - Apr 10 0 2 0 V
-
SERVICE LIFE EXTENTION FOR LLB
WELL TRIPOD PLATFORM
Prepare structural analysis (in-place, seismic,fatique,
vortex and wave slam, deck lifting & design report)
V V V
amiruddin Jakarta US$ 18,000 Mar 10 - Dec 10 2 3 2 V V V V
-
Engineering Recommendation Package
for FCP (Facilities Change Permit) Project
Generate engineering recommendation package for
Facilities Change Permit
V V V
Restu Purboseso Jakarta US$ 51,500 Feb 10 - May 10 3 4 0 V V
-
Instrument & Control Engineering
Assistance
The Scope of engineering services to perform the
Work Order #192 is to provide Mechanical Engineer
assistance
V V V
Bambang S Jakarta US$ 102,000 Mar 10 - Mar 11 0 2 0 V
-
Engineering & Construction Engineering
Package for ECOM Retrofit
Site Visit, review design basis & Philosophy,
specification, datasheet, cable schedule, MTO,
Drawing, TBE, construction supervision, review
commisioning & Start Up Procedure.
V V V
Rustam Effendi Jakarta US$ 62,000 Feb 10 - Jul 10 1 1 2 V V V
-
Junior Mechanical Engineer Assistance The Scope of engineering services to perform the
Work Order #201 is to provide Mechanical Engineer
assistance
V V V
Tri Agusman Jakarta US$ 133,000 Apr 10 - Mar 11 0 0 2 V
-
Isometric Drawing for NUI Provide Designer dan Drafter for As built Drawing NUI
V V V
Tri Agusman Jakarta US$ 114,000 Apr 10 - Dec 10 0 2 2 V
-
Engineering Specification For PHE ONWJ
2011
The scope of works include activities as follows :
review previous engineering specification from BP
West Java, ARII, review engineering specification
from common Oil & Gas Industries, review
International Standard and Local Regulation, review
existing condition on ONWJ. (WO # 273)
Suryono Nano US$ 48,000 Feb 11 - Dec 11
Oil
Gas
Condensate
Chemicals
LNG
Onshore
Offshore
Construction
Installation
Quantity Personnel
Supplied
Appraisal
Concept Select.
Detail Eng.
Execution
EPC Management
Client Address & Phone
Contact
Person
Work Location Contract Value
Period & Progress
Status
Nature of Project
Faciliti
es
Client Information Contract Information
Engineering
Phase
Project
Management
Services
PT. DEPRIWANGGA ENGINEERING PROJECT HISTORY (1998-Present)
No Project Name Scope of Work
. & Start-Up
ing
-
CRR Safety Scoping For Low Risk
Flowstation (NGL, Papa, ZULU, AVSA,
AA, FSO, MK TP ORF) Continuous Risk
Reduction Scoping For Low Risk
Flowstation
The scope of work : Generl Safety Support, this CRR
scoping is supporting to PHE following flowstations,
Level 1 Score card, Level 2 CRR Work list, Marked
Up P & ID's. (WO # 279)
Margareta T US$ 52,784 Apr 11 - Jul 11
-
Pipeline Replacement Project 2011 The scope of work : install new pipeline ESA-EPRO
Main Oil Line 10'' size, 8.3 miles length, install future
tie in provision for ETA pipeline, install new risers at
ESA & EPRO platform, install new pipeline EB-EPRO
Main Oil Line 6'' size, 1.5 miles length. (WO #245)
Yuyung S Girindra /
Edim Toto S
US$ 123,452 Apr 11 - Sep 11
-
Additional Scope For LIMA Subsidence
Remediation
The scope of work : Boatlanding check for reduced
criteria, Seismic analysis extract for comparison,
Boatlanding impact drawing , additional Manhour for
laser scanning activity due to bad weather. (WO #
282)
Sophia Kangan US$ 24,540 May 11 - Jul 11
-
PHE ONWJ Instrument Datasheet the scope of work : Generate Instrument datasheets.
(WO # 281)
Soeryono Nano US$ 2,912 May 11 - Sep 11
-
Innovation ZULU ZELDA Monitoring and
Control System
The scope of work : Design engineering, HMI
programming, Engineering documentation, Start Up
and commissioning supervision. (WO #276)
Heru Tri Windarto US$ 30,005 Jun 11 - Dec 11
-
Innovation Study On Electrical Power
Alternative For APN
The scope of work : Electrical load list calculation,
Main battery sizing, Diesel generator supply and Dc
charger sizing, Comparative Study of Wind, Wave,
Diesel and Solar Cells as Power Source Alternative.
(WO #287)
Bambang
Pudjiantoro
US$ 33,372 Jul 11 - Dec 11
-
FEED Pipeline Replacement Project 2011 -
Additional
The scope of work : install new pipeline ESA-EPRO
Main Oil Line 10'' size, 8.3 miles length, install future
tie in provision for ETA pipeline, install new risers at
ESA & EPRO platform, install new pipeline EB-EPRO
Main Oil Line 6'' size, 1.5 miles length. (WO #245A)
Yuyung S Girindra /
Edim Toto S
US$ 42,882 Jul 11 - Aug 11
-
APN Pipeline Start Up Transient
Hydraulics (OLGA Simulation)
The scope of work : Data gathering, meeting,
coordination & discussion, model building, simulation,
analysis and report writing. (WO #292)
Harfizal US$ 19,800 Jul 11 - Oct 11
LIMA F & G System Full Upgrade The scope of work : Detail Engineering Construction
for LIMA F & G and LIMA HVAC. (WO #294)
Yupito Prionggo D /
Pudji Rahayu
US$ 75,596 Aug 11 - Oct 11
-
FCP Project 2011 The scope of work : review screening letter, review
and Update P & Id and Safe Chart, review and update
Study report & Calculation, review and update
Datasheet, MTO, RFQ, review and update Hookup
drawing. (WO #297)
Anggoro Hengky P US$ 23,000 Aug 11 - Dec 11
-
Tender Document For Geotechnical
Survey For UL and GG
The scope of work : UL and GG field Developments
for the provision of Geotechnical survey services for
UL and GG field development, exploration wells works
for other Geotechnical survey services to support
exploration wells works. (WO #298)
Yuyung S Girindra US$ 70,251.67 Aug 11 - Dec 11
-
Safety & Emission System Intergration at
Cilamaya
The scope of work : Cimalaya Alarm Enhancement,
SCADA/DCS alarm study, SCADA/DCS alarm
modification, Alarm philosophy, PA/GA system
modification, Interconnection from SCADA to PA/GA
system. (WO #289)
Heru Tri Windarto US$ 25,000 Aug 11 - Dec 11
-
ECHO F & G FEED Project
The scope of work : Engineering philosophy for ECHO
F & G, Drawing layout for ECHO F & G and HVAC.
(WO #299)
Yupito Prionggo D /
Pudji Rahayu
US$ 82,214 Sep 11 - Nov 11
Oil
Gas
Condensate
Chemicals
LNG
Onshore
Offshore
Construction
Installation
Quantity Personnel
Supplied
Appraisal
Concept Select.
Detail Eng.
Execution
EPC Management
Client Address & Phone
Contact
Person
Work Location Contract Value
Period & Progress
Status
Nature of Project
Faciliti
es
Client Information Contract Information
Engineering
Phase
Project
Management
Services
PT. DEPRIWANGGA ENGINEERING PROJECT HISTORY (1998-Present)
No Project Name Scope of Work
. & Start-Up
ing
-
Tender Document For UL and GG
Geophysical Survey
The scope of work : UL field Developments for the
provision of Geophysical survey services for UL field
development, GG field Developments for the provision
of Geophysical survey services for GG field
development. (WO #298A)
Yuyung S Girinda US$ 64,210 Sep 11 - Nov 11
-
As Built Drawing For LIMA F & G Quick
Fix
The scope of work : As Built Drawing for LIMA F & G
Quick Fix Work. (WO #307)
Yupito Prionggo D /
Pudji Rahayu
US$ 12,932 Oct 11 - Dec 11
-
APN Depressurization and Dewatering
Operation (OLGA Simulation)
The scope of work : Depressurization to flare by
opening RO and several valves, Dewatering the APN
pipeline using Hydrocarbon gas without use pig, to
check whether the slugcatcher can accommodate the
surge volume, Analysis & Report. (WO #292A)
Restu / Harfizal US$ 5,500 Oct 11 - Dec 11
-
Boatlanding Replacement Analysis For FA
Platform
The scope of work : Design new Boatlanding to
replace the old orphaned and corroded existing
Boatlanding, Collapse Analysis for Boatlanding design
against Operational and Accidental Impact Load,
Structural Re-analysis due to additional load of new
Boatlanding system includes inplace analysis only,
Lifting analysis, Lifting gear design, Provide detail
drawing for Boatlanding fabrication, Prepare material
Take off, Site Survey to Offshore Platform and Survey
Report. (WO # 304)
Mohammad
Dermawan L
US$ 14,121 Oct 11 - Dec 11
-
Boatlanding Replacement Analysis For FD
Platform
The scope of work : Design new Boatlanding to
replace the old orphaned and corroded existing
Boatlanding, Collapse Analysis for Boatlanding design
against Operational and Accidental Impact Load,
Structural Re-analysis due to additional load of new
Boatlanding system includes inplace analysis only,
Lifting analysis, Lifting gear design, Provide detail
drawing for Boatlanding fabrication, Prepare material
Take off, Site Survey to Offshore Platform and Survey
Report. (WO # 305)
Mohammad
Dermawan L
US$ 14,121 Oct 11 - Dec 11
-
F & G Project LA Platform (Additional
Scope For F & G System Upgrading
Project LIMA Platform
The scope of work : Single line diagrams, lists, cable
and tray layout, Datasheet, MTO, drawing, cable
schedule. (WO #294A)
Yupito Prionggo D /
Pudji Rahayu
US$ 10,000 Oct 11 - Dec 11
Isometric Drawing For NUI 2011 (WO #278) Tri Agusman US$ 270,240 Apr 11 - March 12
Engineering Specification For PHE ONWJ
2012
The scope of works include activities as follows :
review previous engineering specification from BP
West Java, ARII, review engineering specification
from common Oil & Gas Industries, review existing
condition on ONWJ. (WO #293)
Suryono Nano US$ 68,000 Aug 11 - March 12
LA Platforms Abandonment Detailed
Engineering (Option 1)
The scope of works of the study shall include activities
as follows : Process, Process Safety, Mechanical
Discipline, Electrical Discipline, Instrumentation
Discipline, Construction Support. (WO #295A)
Sophia Kangan US$ 65,624 Nov 11 - May 12
LE Platforms Abandonment Detailed
Engineering
The scope of works include activities as follows :
Process, Mechanical/Piping Discipline, Structure
Discipline, Instrument Discipline, Project
Management. (WO #295B)
Sophia Kangan US$ 98,766 Nov 11 - March 12
Detail Engineering For LIMA F/S
Mitigation Due to Re-schedule to Q3-2012
The scope of works of the study shall include activities
as follows : Process, Process Safety, Mechanical
Discipline, Electrical Discipline, Instrumentation
Discipline, Structure, Project Management. (WO
#308)
Sophia Kangan US$ 74,916 Nov 11 - March 12
LB Platform Mods Detailed Engineering
The scope of works of the study shall include activities
as follows : Process, Process Safety, Mechanical
Discipline, Electrical Discipline, Instrumentation
Discipline, Structure, Project Management. (WO
#296)
Sophia Kangan US$ 207,000 Nov 11 - March 12
Oil
Gas
Condensate
Chemicals
LNG
Onshore
Offshore
Construction
Installation
Quantity Personnel
Supplied
Appraisal
Concept Select.
Detail Eng.
Execution
EPC Management
Client Address & Phone
Contact
Person
Work Location Contract Value
Period & Progress
Status
Nature of Project
Faciliti
es
Client Information Contract Information
Engineering
Phase
Project
Management
Services
PT. DEPRIWANGGA ENGINEERING PROJECT HISTORY (1998-Present)
No Project Name Scope of Work
. & Start-Up
ing
LA Platforms Abandonment Detailed
Engineering (Option 2) - Provision For
Four Well To Be Reactivated
The scope of works of the study shall include activities
as follows : Process, Process Safety, Mechanical
Discipline, Electrical Discipline, Instrumentation
Discipline, Structure, Project Management. (WO
#295C)
Sophia Kangan US$ 240,000 Dec 11 - March 12
FCP Project 2012 The scope of work shall include but not limited to :
review screening letter, review and update P & Id and
Safe Chart, review and update study report &
calculation, review and update Datasheet, MTO, RFQ,
review and update Hookup Drawing. (WO
#312)
Anggoro Hengky P US$ 15,000 Jan 12 - March 12
APN Depressurization and Dewatering
Operation (OLGA Simulation)
Re-run stable state Dewatering APNE-A, Re-run
Dewatering APNE-A, Re-run Dewatering APN-F,
Update Report. (WO #292B)
Hanto Yananto US$ 15,000 Jan 12 - Apr 12
Additional Work For LE Platforms
Abandonment Detailed Engineering
The scope of work change of Structural Spec (ASTM
to JIS) will impact on Structural deliverables as
follows : LE well Tripod Platform Structural Analysis
Review, LE Platform - Structural Drawings, LE
Structural Material Take Off. (WO #295D)
Sophia Kangan US$ 7,500 Feb 12 - Apr 12
Additional Work For LB Platform
Modifications Detailed Engineering
The scope of work change of Structural Spec (ASTM
to JIS) will impact on Structural deliverables as
follows : LB well Tripod Platform Structural Analysis
Review, LB Platform - Structural Drawings, LB
Structural Material Take Off. (WO #296A)
Sophia Kangan US$ 11,300 Feb 12 - Apr 12
RKL RPL 2012 The scope of work shall include but not limited to :
Study Enviromental : Socio Economic,
Hydrooceanographist, Air Quality, Physico Chemical,
Marine Biologist, Fishery, Water Management. (WO
#315)
Rossi Yuliani US$ 73,005.83 Feb 12 - Aug 12
UKL UPL For GG Field Development The scope of work shall include but not limited to :
Study Enviromental : Socio Economic,
Hydrooceanographist, Air Quality, Physico Chemical,
Marine Biologist, Fishery, Water Management. (WO
#316)
Rossi Yuliani US$ 33,682.22 Feb 12 - Aug 12
21
Proyek pembangunan Pabrik Fipronil-SC scope pekerjaan adalah engineering sekaligus
supervisi proyek sampai dengn produksi batch
pertama.
V
PT Sanova - BASF sout h
east asia ltd.
cibitung , bekasi Hendra Bekasi US$ 30,000 Jul 2009-jan 2010 5 3 V V V V V V V
22
Technical Services Contract for
Engineering Services STC#295
Provide and perform Engineering Management
Design, Studies, Drafting, Reproduction, Set-up and
provide expertise of project management engineering
and cost estimation, construction management,
integrity engineering & management another related
services to execute and support various project
development and modification of BP West Java
existing oil and gas related facilities
V V V V
BP West Java Limited Perkantoran Hijau Arkadia Tower
D, 10th Floor, Jl TB Simatupang
Kav 85, Jakarta Telp. 021-
78549022 Fax 021-78549061
I Made Sukrajaya Offshore North West
Java Sea Block,
Jakarta
US$. 4,150.707
Dec 07-Dec 10
98 %
Estimate Manhour
100.000
35 65 0 V V V V V V
-
HAZID/HAZOP Assistance The Scope of engineering services to perform the
Work Order #27 is providing engineering man power
to participate HAZOP/HAZID
V V V V
Margareta Jakarta US$ 31,960 Feb 08 - Mar 08 2 3 0 V
-
The scope of contractor involvement in the
HAZID/HAZOD/SIL studies includes the following :
1. Identify any or new previously hazard causes on
initialing factor related to any modification to the
equipment of the process condition that could directly
threaten the safety production personnel or causes
operational problems
2. Identify any or new previously unified safety of
production personnel or causes operational problems
3. Determine the seriousness of consequences for the
identified problems
4. Identify engineering and procedural safeguards
already incorporated into the design that will reduce
the likehood or the severity consequences related to
the identified problems
V V Margareta Jakarta US$ 20.122 Feb 08 - Mar 08
HAZID/HAZOD Study for FN Complex by
ERM
Oil
Gas
Condensate
Chemicals
LNG
Onshore
Offshore
Construction
Installation
Quantity Personnel
Supplied
Appraisal
Concept Select.
Detail Eng.
Execution
EPC Management
Client Address & Phone
Contact
Person
Work Location Contract Value
Period & Progress
Status
Nature of Project
Faciliti
es
Client Information Contract Information
Engineering
Phase
Project
Management
Services
PT. DEPRIWANGGA ENGINEERING PROJECT HISTORY (1998-Present)
No Project Name Scope of Work
. & Start-Up
ing
5.Evaluate the adequacy of existing engineering and
procedural safeguard
6. Recommend additional safeguard or operational
procedure where necessary.
The Scope of work of Escape Evaluation & Rescue
Analysis are to:
· Reviewing existing escape, evaluation & rescue
system in AVSA facility
V V V Artiansyah Jakarta US$ 30.386 Feb 08 - Mar 08
· Determine whether a lifeboat must be provided
-
As Builtt ZULU Platform
CONTRACTOR shall complete As Built activities as
follows :
* Collecting Drawing both hard copy & soft copy
* Collecting Facility Change Permit documents
* Identify drawing & review Facility Change Permit
documents as per of filed verification
* Offshore visit for field verification & get mark up
drawing approval from offshore superintendent
V V Tanto R Zulu Platform
US$
123,275 Feb. 08 - Aug. 08 8 12 0 V
* Backdraft mark up drawing & get review/comment
from Field Engineer, Discipline Engineer & Technical
Authority
* Revise drawing & accommodate review/comment
* Get final approval from Engineering Manager
-
As Built Mike-Mike Platform
CONTRACTOR shall complete As Built activities as
follows :
* Collecting Drawing both hard copy & soft copy Tanto R Mike-Mike Platform
US$
21,400 Feb. 08 - Aug. 08 8 12 0 V
* Collecting Facility Change Permit documents
* Identify drawing & review Facility Change Permit
documents as per of filed verification
As Built Mike-Mike Platform (continued)
* Offshore visit for field verification & get mark up
drawing approval from offshore superintendent
V Tanto R Mike-Mike Platform
US$
21,400 Feb. 08 - Aug. 08 8 12 0 V
* Backdraft mark up drawing & get review/comment
from Field Engineer, Discipline Engineer & Technical
Authority
* Revise drawing & accommodate review/comment
* Get final approval from Engineering Manager
-
Fire & Gas MK & TP
The scope engineering services is to perform the work
order #08 are :
- Study and evaluate investigation for concept and up
grading the OPGD equipment and HSSD on the
Muara Karang and Tanjung Priuk Gas Detection. This
is intended design guideline for ITB and tender
documents to follow up execution recommendation.
To follow up this study we provide 1 process engineer
acts as project control for execution.
V V V Arliansyah
Muara Karang &
Tanjung Priok
US$ 65,164
April 08 - Aug. 08
4 5 0 V V V V V V
-
Control Valve Study for MK & TP
The scopes of engineering services to platform the
Work order #09 are :
* Optimize the number of control valves still needed
due to the recent condition.
V V V Arliansyah
Muara Karang &
Tanjung Priok
US$
12,600 April 08 - June 08 2 4 0 V V
-
EERA for AVSA Facility by ERM